Client: USDA ARS
Project: Steam Decentralization

  • Project included:
    • Demolition
    • Installation of new boilers
    • Gas piping
    • Steam & hot water piping
    • Various sub-contracted construction

Laboratory projects:

  • Fume hood relocation
  • Greenhouse chiller installation
  • HVAC repairs and maintenance


Client: Andrews Air Force Base
Project: Steam Decentralization

  • Installed turn-key HVAC systems for individual buildings
  • Used value engineering to save client enough money to fund numerous optional projects and maintenance of Trademasters installed equipment for a period of two years
  • Project included:
    • Demolition
    • Installation of new high efficiency equipment
    • Duct systems
    • Hot and chilled water coils
    • Gas piping
    • Chillers
    • Boilers
    • Package units
    • Split system
    • Air conditioners
    • Air handlers and gas furnaces
  • Performed work at Air Force One hangar and the VIP lounge
    • Coordination with security and accommodation of high profile customers were essential to the project


Client: F.B.I. J. Edgar Hoover Building
Project: Replacement of 6 Liebert Computer Room Air Conditioning units

  • Project included:
    • Removal of old units
    • Disassembled and reassembled units to fit elevator
    • Units piped in and charged with refrigerant
    • Units tested



Client: City of Baltimore
Project: Package unit replacement and gas conversion

  • Work performed at public buildings and police stations owned by City of Baltimore
  • Project included:
    • Extensive demolition
    • Rigging
    • Electrical work
    • Rooftop package units
    • Fan coil units
    • Gas piping
    • Ductwork modifications



Client: U.S. Naval Observatory
Project: Steam Decentralization

  • Project included:
    • Installation of boilers in many buildings
    • Installation of Geothermal heat pumps
    • Complete replacement and relocation of two million-BTU boilers at the official residence of the Vice President of the United States
    • Installation of humidifier
    • Reconfiguration of the domestic hot water system
    • Installed high efficiency hybrid split system and water heater
      • Served the pool house and insulated piping from pool house to the residence
  • Challenging project due to high-profile customer
    • Stringent security requirements
    • Accommodation of customer



Client: Bolling Air Force Base Defense Intelligence Analysis Center (DIAC)
Project: Installation

  • Installed 3 air handling units
  • Extensive rigging and brick work



Client: Catholic Diocese of Arlington

  • Large capital improvement projects at several locations
  • Replacement of chillers and air handlers
  • Full air conditioning conversion
  • Repair work and routine maintenance



Client: Fort Belvoir
Project: Installation & Service

  • HVAC installation and service
  • Project included:
    • Installed split heat pump systems
    • Installed ductless units
    • Work at hospital and other buildings throughout the base



Client: Metropolitan Washington Airport Authority for Dulles Airport
Project: Unit Replacement & Maintenance Contract

  • Several large rooftop package unit replacements



Other Notable Clients:

Fort Washington: Began work on the officers quarters renovation project

George Mason University: Performed mechanical work involved with a renovation project at

several buildings.

Fairfax County Public Schools: Replaced large commercial package unit.

Fort Meade: Replaced HVAC systems in a building.

National Naval Medical Center: Performed HVAC repairs and service work

Arlington National Cemetery: Performed HVAC installation