Previous Clients
Client: USDA ARS
Project: Steam Decentralization
- Project included:
- Demolition
- Installation of new boilers
- Gas piping
- Steam & hot water piping
- Various sub-contracted construction
Laboratory projects:
- Fume hood relocation
- Greenhouse chiller installation
- HVAC repairs and maintenance
Client: Andrews Air Force Base
Project: Steam Decentralization
- Installed turn-key HVAC systems for individual buildings
- Used value engineering to save client enough money to fund numerous optional projects and maintenance of Trademasters installed equipment for a period of two years
- Project included:
- Demolition
- Installation of new high efficiency equipment
- Duct systems
- Hot and chilled water coils
- Gas piping
- Chillers
- Boilers
- Package units
- Split system
- Air conditioners
- Air handlers and gas furnaces
- Performed work at Air Force One hangar and the VIP lounge
- Coordination with security and accommodation of high profile customers were essential to the project
Client: F.B.I. J. Edgar Hoover Building
Project: Replacement of 6 Liebert Computer Room Air Conditioning units
- Project included:
- Removal of old units
- Disassembled and reassembled units to fit elevator
- Units piped in and charged with refrigerant
- Units tested
Client: City of Baltimore
Project: Package unit replacement and gas conversion
- Work performed at public buildings and police stations owned by City of Baltimore
- Project included:
- Extensive demolition
- Rigging
- Electrical work
- Rooftop package units
- Fan coil units
- Gas piping
- Ductwork modifications
Client: U.S. Naval Observatory
Project: Steam Decentralization
- Project included:
- Installation of boilers in many buildings
- Installation of Geothermal heat pumps
- Complete replacement and relocation of two million-BTU boilers at the official residence of the Vice President of the United States
- Installation of humidifier
- Reconfiguration of the domestic hot water system
- Installed high efficiency hybrid split system and water heater
- Served the pool house and insulated piping from pool house to the residence
- Challenging project due to high-profile customer
- Stringent security requirements
- Accommodation of customer
Client: Bolling Air Force Base Defense Intelligence Analysis Center (DIAC)
Project: Installation
- Installed 3 air handling units
- Extensive rigging and brick work
Client: Catholic Diocese of Arlington
- Large capital improvement projects at several locations
- Replacement of chillers and air handlers
- Full air conditioning conversion
- Repair work and routine maintenance
Client: Fort Belvoir
Project: Installation & Service
- HVAC installation and service
- Project included:
- Installed split heat pump systems
- Installed ductless units
- Work at hospital and other buildings throughout the base
Client: Metropolitan Washington Airport Authority for Dulles Airport
Project: Unit Replacement & Maintenance Contract
- Several large rooftop package unit replacements
Other Notable Clients:
Fort Washington: Began work on the officers quarters renovation project
George Mason University: Performed mechanical work involved with a renovation project at
several buildings.
Fairfax County Public Schools: Replaced large commercial package unit.
Fort Meade: Replaced HVAC systems in a building.
National Naval Medical Center: Performed HVAC repairs and service work
Arlington National Cemetery: Performed HVAC installation